SOP Logo

Arrival of Vessel: For Ship Officer

(Extract from page 5 in SOP document)
  • Joint inspection of cargo hatch per hatch by Supercargo and Ship Officer and Operation Manager of assigned stevedoring contractor and Agent of vessel.
  • Super cargo writes report on cargo condition and stowage. Noting where there are discrepancies. Report is signed by all involved in the inspection.

back to index | download complete SOP

Bulk/Steel: For Ship Officer

(Extract from page 5 in SOP document)
  • Surveyor mounts the vessel and receive vessel documents from Ship Officer.
  • Surveyor with other government and NPA Surveyors with Ship Officer go ashore and on board to take all necessary reading to calculate initial draft of cargo on arrival. Initial draft figure is endorsed by Ship Officer.
  • Supercargo boards the vessel for cargo joint inspection with Ship Officer, Stevedore and Agent of vessel for condition report All discrepancies if any, are noted on the report and signed.

back to index | download complete SOP

Provisional Bill: For Port Agent, shipping company

(Extract from page 24 in SOP document)

The core document required for provisional billing is manifest which is sent to commercial through copi section in Admin department. The manifest must be stamped by customs and accompanied by the following:

  1. Ship entry notice (SEN) from NPA
  2. Ship inward report
  3. All bills of lading that must correspond with information in the manifest.
  4. It must come with the stowage plan of the ship.
  5. The manifest must come in hard and soft copy form E.g. XML for electronic importation into the shipping terminal management system (STMS).
  6. Agreement between ENL and the shipping company.

back to index | download complete SOP

Statutory Requirement: For Shipping Company and Ship Agent

(Extract from page 28 in SOP document)

Shipping company must declare vessel at NPA Habours daily meeting. This is to enable avoidance of congestion and optimal pilotage and harbours facility use. ENL habour coordinator must declare vacant berths, draft and length to enable determination of vessel type to berth and ships position published and submitted to NPA, Ships Agent must submit ships entry notice (SEN) from NPA and CUSTOS and Excise approved cargo inward and manifest to ENL central office for planning and implementation. Limited hard copy (4 copies) and the XML is required but e-manifest is now to be implemented.

back to index | download complete SOP

Ship Pre-arrival Planning: For Ship Agent

(Extract from page 28 in SOP document)
  • Terminal line Managers hold a preplanning meeting with respective ships agents at 13oohrs before ships docking to avoid low cargo unloading or loading throughout, inadequate and unsuitable plan and equipment, insufficient yard and personnel supply.
  • Determine Daily cargo loading or unloading required from the stevedoring handling respective vessel (target productivity).
  • Determine stowage system, equipment type requirement, check daily plant and equipment compliment from workshop department check stevedores requirement to avoid use of unsuitable gear or non-availability.
  • Check the ETA and ETB of vessel to ease berthing arrangement.
  • Manifest submitted to commercial for customer bills within 15mins of Receipts.

back to index | download complete SOP

Ship Berthing: For Ship Agent

(Extract from page 29 in SOP document)
  • Ship Agent informed of berth where vessel is stemmed at berthing meeting and on-line.

back to index | download complete SOP

Download Complete SOP here
 

BAAC MACN